Kitchen renovation · Málaga to Estepona

NEW KITCHEN COSTA DEL SOL

From a dated kitchenette to an open-plan living kitchen: we handle planning, strip-out, installations and fitting — all from one team, with one English-speaking contact.

Kitchen renovation on the Costa del Sol — everything from one team

A new kitchen is more than new cabinets: water and waste pipes, electrical connections, extraction, tiling and often a wall that needs to go. We coordinate all the work in the right order, so your kitchen is finished quickly and without unpleasant surprises.

Whether it is a compact kitchen in a Fuengirola apartment or a large living kitchen in a Marbella villa, you receive a detailed fixed-price quote and one point of contact who speaks English.

What we do

  • Removal of the old kitchen and proper disposal
  • Opening up walls for an open-plan kitchen (after a structural check)
  • New water, waste and electrical installations
  • Tiles, microcement and wall cladding
  • Fitting of kitchen units, worktops and appliances
  • Lighting, extractor hood and ventilation

How your kitchen renovation works

  • 1. Free site visit and measurement
  • 2. Planning and detailed fixed-price quote
  • 3. Choice of units, worktop and appliances
  • 4. Work carried out with regular photo updates
  • 5. Fitting, final clean and handover

Good to know

If a load-bearing wall is to be removed, a structural engineer first checks what is possible, and a building permit is required. For a kitchen renovation without structural changes, a notice to the town hall (declaración responsable) is usually enough. We check this in advance and handle the paperwork.

Why German Construct?

One point of contact for all trades, communication in English or German, detailed fixed-price quotes and regular photo updates — so your project runs smoothly, whether you live here all year or spend part of it in Scandinavia, the Netherlands or elsewhere in Europe.

Where we work

We work along the western Costa del Sol, between Málaga and Estepona: Málaga, Torremolinos, Benalmádena, Fuengirola, Mijas, Marbella, Nueva Andalucía, San Pedro Alcántara, Benahavís and Estepona.

More services

Bathroom renovation · Drywall & partition walls · Painting & decorating · Tiling & flooring · Roof repair & waterproofing · Pool construction & renovation

FAQ

Kitchen renovation — FAQ

How long does a kitchen renovation take?+
Usually 4 to 8 weeks, depending on the scope and the delivery time of the kitchen units. You receive the exact schedule with the quote.
Can you install a kitchen I have already bought?+
Yes. We can fit a kitchen you have chosen, or advise you on the choice and carry out all the preparatory work — pipes, electrics and tiling.
Can a wall be removed for an open-plan kitchen?+
Often, yes. A structural engineer checks beforehand whether the wall is load-bearing; for load-bearing walls a building permit is required, which we apply for on your behalf.
Do I need to be there while the work is done?+
No. We agree all details with you in advance and send you regular photos of the progress, so you can follow your project from home.

Ready for your new kitchen?

Book a free site visit — in English, with no obligation and no hidden costs.

Get a free consultation WhatsApp
DE +49 160 96740647 ES +34 654 379 749